Wiring for new homes, shops, and ADUs — rough-in to final
Complete electrical for custom homes, ADUs, and detached shops in southwest Washington, for owner-builders and homeowners building on their own property. Rough-in through trim-out, scheduled around your framer, insulator, and inspector. Permitted, inspected, and warrantied for two years.
Free estimates on installs · $125 to diagnose, credited to the repair
Licensed, bonded, and insured · WA #TRUWOEL745MO
- Licensed · bonded · insured
- Two-year labor warranty
- Upfront pricing
- Evenings and weekends

The day the lights go on
Rough-in happens before the drywall and nobody ever sees it. This is the part you do see — trim-out finished, fixtures in, breakers labeled, and the house lit up before the driveway’s even poured.
Getting there means showing up when the framer’s done and not a week later. On a build, the schedule is the job.
What’s included
- Electrical plan from your drawings — service size, panel location, circuits, and a device layout you can mark up
- Temporary power coordination and the service and meter base set to the utility’s spec
- Rough-in: all wiring, boxes, and panel, with the rough inspection passed before insulation
- Trim-out: devices, fixtures, fans, appliance hookups, and the final inspection passed
- Permit pulled by Truworx — you don’t deal with L&I
- L&I inspection scheduled and passed, with the paperwork left with you
- Cleanup — packaging and old parts hauled off, floors vacuumed
- Two-year warranty on labor
What it costs
New construction is priced from the plans: square footage, number of devices and fixtures, service size, and anything beyond the basics — an EV charger circuit, a hot tub, a shop subpanel, a generator inlet, exterior and landscape lighting. It’s normally quoted as one number for the whole job, split into rough-in and trim-out payments.
What moves it: a 200-amp service versus 400, how far the meter is from the panel and the panel from the far end of the house, the number of recessed lights, and whether you supply fixtures. Permit fees are set by L&I and passed through at cost.
Free estimates on installs. Send the plans and a rough idea of your finish level and you’ll get a written number to build your budget around.
How it goes
- You send me the plans. I put together a device layout and a number, and we go through it together.
- I pull the permit and coordinate the service with the utility. Rough-in happens once framing, plumbing, and HVAC rough are done.
- I call for the rough inspection before insulation, then trim out after drywall, paint, and cabinets.
- Final inspection passed, panel labeled, and a walkthrough of where everything is.
Good to know
Do you work with owner-builders?
Yes, and I like it. If you’re building your own home, ADU, or shop and acting as your own general, I’ll work directly with you: plan the electrical, tell you what I need done before I show up, and keep you posted on inspections. You’re still a homeowner hiring an electrician, which is exactly who Truworx works for.
What do you need from me to quote it?
The plans (a PDF is fine), the finish level you’re picturing — how many recessed lights, a rough fixture budget — and anything special: EV charger, hot tub, shop, generator, exterior lighting. Where the utility’s service comes from helps too. With that I can give you a firm number rather than an allowance.
How do rough-in and finish inspections work?
There are two electrical inspections from L&I. The rough inspection happens after all the wire and boxes are in and before insulation and drywall cover them; the inspector checks the wiring, box fill, and grounding. The final happens after devices and fixtures are in and the panel is done. I schedule both, I’m there for both, and the house doesn’t get its occupancy until the final passes.
Can you wire a detached shop or ADU?
Yes. A shop usually gets a subpanel fed from the main house or its own meter, and I coordinate the trench and the feeder size to what you plan to run — welder, compressor, heat. An ADU is a small house, with its own panel and everything a house needs; it may need its own meter depending on how you plan to use it, and I’ll walk you through that with the utility.
How far ahead should I book?
Get me the plans as soon as you have them, even before the foundation is in. That way the number’s done, the permit’s pulled, and rough-in is on the calendar for when framing wraps. Four to eight weeks of notice for rough-in is comfortable; less can work if the schedule’s open.
Service area
Serving Brush Prairie, Vancouver, Battle Ground, Ridgefield, La Center, Kalama, Kelso, and Longview — Clark and Cowlitz counties, southwest Washington.
New construction wiring in southwest Washington — send me your plans and I’ll give you a number.
Free estimates on installs · $125 to diagnose, credited to the repair
Or text (509) 565-0103 — I’ll answer between jobs.
Licensed, bonded, and insured · WA #TRUWOEL745MO