Panel upgrade in Clark County — permitted, inspected, priced before I start

Replacing Federal Pacific, Zinsco, and full or failing panels, and upgrading 100-amp services to 200 amps for EV chargers and heat pumps. Permit pulled, L&I inspection scheduled, utility coordinated, and a two-year warranty on the labor.

Free estimates on installs · $125 to diagnose, credited to the repair

Licensed, bonded, and insured · WA #TRUWOEL745MO

  • Licensed · bonded · insured
  • Two-year labor warranty
  • Upfront pricing
  • Evenings and weekends

Newly installed flush-mount residential electrical panel with conductors dressed square and breakers labeled

What a finished panel looks like

Conductors dressed and landed square, every breaker labeled, and space left for whatever you add next — an EV charger, a heat pump, a shop out back.

This is how I leave one before the inspector sees it. You get photos of yours the same way, whether you’re home that day or not.

What’s included

  • Load calculation, so the new panel is sized for what you’re adding now and later
  • Coordination with Clark Public Utilities or Cowlitz PUD for the disconnect and reconnect
  • New panel and breakers, with grounding and bonding brought up to current code
  • Photos and a copy of the passed permit for your insurance company, if that’s why you called
  • Permit pulled by Truworx — you don’t deal with L&I
  • L&I inspection scheduled and passed, with the paperwork left with you
  • Cleanup — packaging and old parts hauled off, floors vacuumed
  • Two-year warranty on labor

The tag on the side is the point

Every service I touch gets permitted and inspected, and the approval tag goes on the enclosure where anyone can find it later.

That tag plus the passed permit is what your insurance company asks for, and what a buyer’s inspector looks for when you sell. You get a copy of both.

Exterior meter base and service disconnect with the orange inspection approval tag on the enclosure

What it costs

There are two versions of this job, and they’re priced differently. A panel swap replaces the breaker box on the wall with a new one of the same size; a service upgrade also replaces the meter base, the mast or underground conductors, and the grounding, so the whole service is bigger — usually 100 amps to 200.

What moves the number: whether it’s a swap or a full upgrade, overhead or underground service from the street, how far the panel is from the meter, whether the grounding electrode system needs to be redone, and whether you want the panel moved. Permit fees are passed through at cost, and the utility may charge its own fee on a service upgrade.

Free estimates on installs. Text a photo of your panel with the door open and one of the meter, and most of the time I can give you a number the same day.

How it goes

  • You call or text. I’ll ask for a photo of the panel and the meter and give you a number, or come out if I need to see it.
  • I pull the permit and schedule the utility for the shutoff — usually one to two weeks out.
  • Panel day: the power’s off most of the day. I text when I’m on my way, and you have everything back on that evening.
  • L&I inspects, I handle anything they flag, and you get the passed permit for your records.

Good to know

How much does a 200 amp panel upgrade cost?

It depends on whether it’s a swap or a full service upgrade, whether your service comes in overhead or underground, and how much of the grounding needs to be brought up to code. I don’t quote a range on the website because a number that’s wrong for your house isn’t useful. Text me photos of the panel and meter and I’ll give you a real number, free, usually the same day.

Do I need a permit?

Yes. In Washington, replacing or upgrading a panel requires an electrical permit from L&I (Labor and Industries), and the work has to be inspected. I pull the permit in Truworx’s name and I’m there for the inspection. The passed permit is what your insurance company and a future buyer will want to see.

How long is the power off?

Most of one day — typically from mid-morning until late afternoon. Keep the fridge and freezer closed and they’ll be fine. If you work from home, plan to be somewhere with power that day. For a service upgrade the utility reconnects the same day in almost every case, and I don’t leave until you have power.

My insurance says I need a new panel — what do they mean?

Usually one of three things: a Federal Pacific (Stab-Lok) panel, a Zinsco panel, or an old fuse box. Federal Pacific and Zinsco breakers have a history of not tripping when they should, and many insurers won’t write or renew a policy with one in the house. I replace the panel, and I send you photos and the passed permit to forward to your agent.

Does Clark Public Utilities / Cowlitz PUD have to be involved?

For a full service upgrade, yes — the utility has to disconnect at the pole or transformer and reconnect when the inspection passes, and they may need to upgrade their side. For a like-for-like panel swap, often the meter just gets pulled and reset. Either way I coordinate it. Clark Public Utilities covers Clark County; Cowlitz PUD covers Kalama, Kelso, and Longview.

Service area

Serving Brush Prairie, Vancouver, Battle Ground, Ridgefield, La Center, Kalama, Kelso, and Longview — Clark and Cowlitz counties, southwest Washington.

Panel upgrade in Clark County — tell me what you’ve got and I’ll give you a number.

Free estimates on installs · $125 to diagnose, credited to the repair

Or text (509) 565-0103 — I’ll answer between jobs.

Licensed, bonded, and insured · WA #TRUWOEL745MO